E RED BANK & EVERGREEN

Woodbury City, Gloucester County · Block 149, Lot 2

Show on map

Assessment year 2026 · Rate year 2025 · Prior rate 2024

Assessments are tax year 2026; latest published general rate we have is 2025. Estimate uses that rate until the 2026 rate is loaded.

Estimated tax story (homeowner view)
+1.1%

Estimated tax up $2,264 ($201,677 → $203,941) using 2024→2025 rates (4.811 → 4.865) × assessed net.

Assessment net change: 0.0% ($4,192,000 → $4,192,000).

Assessment

Land$1,225,000
Improvements$2,967,000
Net (taxable assessed, 2026)$4,192,000
Town avg ratio used61.62% (Average ratio (Director’s / Chapter 123))
Implied equalized value$6,802,986
2025 tax (MOD-IV billed)$203,940.80
Est. 2025 tax @ general rate$203,941
Mailing address (2026)10 E 39TH ST 4TH FLR, NEW YORK; NY, 10016

How the ratio works: New Jersey towns often assess below full market value. The average ratio (Director’s / Chapter 123) estimates what percent of true market value the town’s assessments represent. Implied equalized value ≈ assessed net ÷ (ratio ÷ 100). Example: assessed $187,600 at 55.89% ≈ $335,700 equalized. Tax bills still use assessed value × the general tax rate — not the equalized figure.

Change since the 2019 sale of $4,225,000: implied equalized value $6,802,986 is $2,577,986 above that sale. This is not an appraisal.

Building permits for E RED BANK & EVERGREEN

The New Jersey construction-permit file lists 16 permits for E RED BANK & EVERGREEN in Woodbury City. 4 are still open in the state file. Permit 20240160W, an alteration, was issued 22 Apr 2024 and is open in the state file. The reported cost is $900.

Permit Type Use Issued Closed Reported cost
20210280W Alteration Business Uses 26 Jul 2021 Open in the state file $20,000
20220083W Alteration Business Uses 24 Feb 2022 20 Oct 2022, Certificate of Approval $15,000
20220082W Alteration Business Uses 24 Feb 2022 19 Apr 2022, Certificate of Occupancy $67,965
20220175W Alteration Business Uses 14 Apr 2022 Open in the state file $32,575
20220201W+A Alteration Business Uses 28 Apr 2022 9 Aug 2022, Certificate of Approval $36,000
20220201W Alteration Business Uses 28 Apr 2022 9 Aug 2022, Certificate of Occupancy $315,165
20220175W+A Alteration Business Uses 10 May 2022 20 Oct 2022, Certificate of Approval $75,000
20220239W Alteration Business Uses 17 May 2022 27 Oct 2022, Certificate of Approval $2,700
20220240W Alteration Business Uses 19 May 2022 20 Oct 2022, Certificate of Approval $350,000
20220201W+B Alteration Business Uses 20 May 2022 9 Aug 2022, Certificate of Approval $5,000
20220365W Alteration Business Uses 23 Aug 2022 17 Oct 2022, Certificate of Approval $5,250
20230212W Alteration Business Uses 12 Jun 2023 12 Oct 2023, Certificate of Approval $39,448
20230212W+A Alteration Business Uses 12 Jun 2023 12 Oct 2023, Certificate of Approval $350
20230478W Alteration Business Uses 27 Dec 2023 26 Mar 2024, Certificate of Occupancy $117,000
20240032W Alteration Business Uses 22 Jan 2024 Open in the state file $2,150
20240160W Alteration Business Uses 22 Apr 2024 Open in the state file $900

The file does not name the work. This file is a full record from 2021 on. Older permits are mostly missing. A repair from before then can be absent here and still be at the Woodbury City construction office.

Flood zone for E RED BANK & EVERGREEN

FEMA’s flood map did not respond for E RED BANK & EVERGREEN. Assessment and tax figures on this page are from our own records.

The state’s 10-foot ground scan puts the lowest cell on this lot at 10.1 feet and the highest at 25.1 feet (NAVD88).

These figures are estimates. The zone and any flood elevation come from FEMA’s flood map at a point for this address, and that point can fall in the street. The high and low come from the state’s 10-foot ground scan of the lot outline. A cell can catch a ditch, the street, or the edge of the lot. They are not a survey and not an insurance rating. A licensed surveyor measures the ground and the building. The town floodplain administrator, or a licensed engineer, confirms what the zone means for this lot. No zone at this point, or zone X, does not mean the lot will not flood.

Water and sewer for E RED BANK & EVERGREEN

This lot is within the Gloucester County UA STP sewer system. Please verify with the provider.

This lot is within the Woodbury City WD water system. Please verify with the provider.

These lines come from the state’s sewer service areas and public community water areas, read at a point for this address. That point can fall in the street. Being inside a named area means the lot is inside that mapped system, not that a pipe or a meter is on the house. Being outside means the lot is outside the mapped service area, which is usually a septic system or a private well. It is not a hookup record. Please verify with the provider. How we read water and sewer.

Year-by-year assessed value & tax

From NJ MOD-IV files (2023, 2024, 2025, 2026). Tax is the MOD-IV billed amount when present; otherwise —. Current mailing is in Assessment above.

Year Assessed net Tax
2026 $4,192,000 —
2025 $4,192,000 $203,940.80
2024 $4,192,000 $201,677.12
2023 $4,192,000 $194,508.80

Assessed value & ratio history

Parcel assessed nets come from MOD-IV year files (2023, 2024, 2025, 2026). Town average ratios are from Abstract / Chapter 123 when available — implied equalized = assessed ÷ (ratio ÷ 100).

Tax year Assessed net Avg ratio Implied equalized Assessed Δ Equalized Δ
2023 $4,192,000 83.49% $5,020,961 — —
2024 $4,192,000 73.85% $5,676,371 0.0% +13.1%
2025 $4,192,000 67.22% $6,236,239 0.0% +9.9%
2026 $4,192,000 61.62% $6,802,986 0.0% +9.1%

Tax year history

Assessed net is from that year’s MOD-IV file. Est. tax = assessed × that year’s general rate when we have the rate sheet. Billed tax is the MOD-IV tax field when present (often empty for the newest file year).

Tax year Assessment net General rate Est. tax (that year) Billed tax Est. vs prior
2023 $4,192,000 4.640 $194,509 $194,508.80 —
2024 $4,192,000 4.811 $201,677 $201,677.12 +3.7%
2025 $4,192,000 4.865 $203,941 $203,940.80 +1.1%
2026 $4,192,000 — — — —

Where your money goes

Component $ = net × (component rate ÷ 100). Percents are share of school + county + municipal components for rate year 2025.

Schools
$92,685 45.4%
County
$28,673 14.1%
Municipal
$82,582 40.5%

Of the estimated increase of $2,264, the school portion moved $1,551 down, the county portion $0 up, and the municipal portion $3,815 up. Those are pieces of the dollar change. They are not a change in each share of the rate.

District school (2.211)$92,685
County (0.641)$26,871
County open space (0.043)$1,803
Municipal purpose (1.921)$80,528
Municipal library (0.049)$2,054

Property details

Class4A — Commercial
Building class—
BuildingEVERGREEN SQUAR
Land description4.90 AC
Dwellings—
Commercial units—
Year built1960
Acreage4.9
Zoning—
Tax map pageM41
Additional lots—
Census tract / block—
Special tax codes—
MOD-IV current-year tax—
Last sale$4,225,000 · 12/27/2019 · sale assessment $3,900,000
Deed book / page06214 / 00138

The class, building class, SR1A, and special-tax words are the state’s names for those codes. The zoning code is the town’s. A code that is not on the state list keeps the code and says so.

See this lot on the statewide map, then come back for the full tax story.

Show on map

Sources: NJ Division of Taxation MOD-IV (current parcel file) and tax rates for 2025 (Abstract of Ratables). Building permits are read live from the NJ construction-permit file for this block and lot. The flood zone is read live from FEMA’s flood map at a point for this address. The high and low are read live from the state’s 10-foot ground scan. Water and sewer are read live from the state’s service-area maps at that same point. Those map readings are estimates, not a survey and not a hookup record. Estimates are not an official tax bill. Owner names are not shown. Water and sewer · Full disclaimer.