200 WINSTON DR-C1007

Cliffside Park Boro, Bergen County · Block 3601, Lot 5, Qual C1007

Show on map

Assessment year 2026 · Rate year 2025 · Prior rate 2024

Assessments are tax year 2026; latest published general rate we have is 2025. Estimate uses that rate until the 2026 rate is loaded.

Estimated tax story (homeowner view)
+2.9%

Estimated tax up $253 ($8,723 → $8,976) using 2024→2025 rates (2.756 → 2.836) × assessed net.

Assessment net change: 0.0% ($316,500 → $316,500).

Assessment

Land$159,500
Improvements$157,000
Net (taxable assessed, 2026)$316,500
Town avg ratio used63.94% (Average ratio (Director’s / Chapter 123))
Implied equalized value$494,995
2025 tax (MOD-IV billed)$8,725.94
Est. 2025 tax @ general rate$8,976
Mailing address (2026)200 WINSTON DR #1007, CLIFFSIDE PARK; NJ, 07010

How the ratio works: New Jersey towns often assess below full market value. The average ratio (Director’s / Chapter 123) estimates what percent of true market value the town’s assessments represent. Implied equalized value ≈ assessed net ÷ (ratio ÷ 100). Example: assessed $187,600 at 55.89% ≈ $335,700 equalized. Tax bills still use assessed value × the general tax rate — not the equalized figure.

Change since the 2025 sale of $440,000: implied equalized value $494,995 is $54,995 above that sale. This is not an appraisal.

This class 2 — residential (four families or less) — net assessment sits below the town class-2 average of $381,862.

Building permits for 200 WINSTON DR-C1007

The New Jersey construction-permit file lists 50 permits for 200 WINSTON DR-C1007 in Cliffside Park Boro. Permit 2009-424, an alteration, was issued 10 Aug 2009 and closed 25 Feb 2026 with a Certificate of Approval. The reported cost is $7,000.

Permit Type Use Issued Closed Reported cost
99-460 Alteration Multiple family dwellings, dormitories, etc. 18 Oct 1999 18 Jun 2000, Certificate of Approval $105,000
99-485 Alteration One and two family units, 5 lodgers or less each 27 Oct 1999 18 Jun 2000, Certificate of Approval $86,000
2000-60 Alteration Multiple family dwellings, dormitories, etc. 22 Feb 2000 10 Apr 2003, Certificate of Approval $550
2000-158 Alteration Multiple family dwellings, dormitories, etc. 24 Apr 2000 12 May 2001, Certificate of Approval $2,000
2000-329 Alteration Multiple family dwellings, dormitories, etc. 19 Jul 2000 19 Nov 2000, Certificate of Approval $4,400
2000-460 Alteration Multiple family dwellings, dormitories, etc. 26 Sep 2000 9 Mar 2022, Certificate of Approval $1,200
2000-477 Alteration Multiple family dwellings, dormitories, etc. 4 Oct 2000 4 Dec 2000, Certificate of Approval $2,500
2001-15 Alteration Multiple family dwellings, dormitories, etc. 16 Jan 2001 4 Apr 2006, Certificate of Approval $22,200
2001-26 Alteration Multiple family dwellings, dormitories, etc. 22 Jan 2001 9 Mar 2022, Certificate of Approval $2,100
2001-33 Alteration Multiple family dwellings, dormitories, etc. 29 Jan 2001 15 Mar 2003, Certificate of Approval $3,000
2001-79 Alteration Multiple family dwellings, dormitories, etc. 13 Mar 2001 14 Apr 2004, Certificate of Approval $9,400
2001-147 Alteration Multiple family dwellings, dormitories, etc. 18 Apr 2001 9 Mar 2022, Certificate of Approval $2,400
2001-290 Alteration Multiple family dwellings, dormitories, etc. 15 Jun 2001 9 Mar 2022, Certificate of Approval $19,000
2001-392 Alteration Multiple family dwellings, dormitories, etc. 6 Aug 2001 6 Oct 2001, Certificate of Approval $3,950
2001-424 Alteration Multiple family dwellings, dormitories, etc. 17 Aug 2001 15 Feb 2002, Certificate of Approval $3,000
2001-472 Alteration Multiple family dwellings, dormitories, etc. 17 Sep 2001 21 Apr 2025, Certificate of Approval $6,800
2001-604 Alteration Multiple family dwellings, dormitories, etc. 8 Nov 2001 8 Dec 2021, Certificate of Approval $4,000
2002-701 Alteration Multiple family dwellings, dormitories, etc. 8 Nov 2002 22 Feb 2022, Certificate of Approval $400
2003-220 Alteration Multiple family dwellings, dormitories, etc. 23 Apr 2003 18 Apr 2004, Certificate of Approval $400
2004-53 Alteration Multiple family dwellings, dormitories, etc. 18 Feb 2004 24 Feb 2004, Certificate of Approval $555
2004-790 Alteration Multiple family dwellings, dormitories, etc. 8 Nov 2004 9 Mar 2022, Certificate of Approval $2,500
2004-810 Alteration Multiple family dwellings, dormitories, etc. 16 Nov 2004 16 Sep 2022, Certificate of Approval $9,100
2005-123 Alteration Multiple family dwellings, dormitories, etc. 14 Mar 2005 16 Sep 2022, Certificate of Approval $8,800
2005-401 Alteration Multiple family dwellings, dormitories, etc. 24 Jun 2005 9 Mar 2022, Certificate of Approval $2,600
2005-582 Alteration Multiple family dwellings, dormitories, etc. 2 Sep 2005 6 Dec 2023, Certificate of Approval $18,800
2005-788 Alteration Multiple family dwellings, dormitories, etc. 14 Nov 2005 14 Feb 2006, Certificate of Approval $3,100
2005-814 Alteration Multiple family dwellings, dormitories, etc. 23 Nov 2005 21 Apr 2025, Certificate of Approval $15,000
2005-857 Alteration Multiple family dwellings, dormitories, etc. 16 Dec 2005 26 Jun 2026, Certificate of Approval $2,700
2006-08 Alteration Multiple family dwellings, dormitories, etc. 6 Jan 2006 9 Mar 2022, Certificate of Approval $3,500
2006-39 Alteration Multiple family dwellings, dormitories, etc. 23 Jan 2006 17 Aug 2021, Certificate of Approval $4,600
2006-484 Alteration Multiple family dwellings, dormitories, etc. 14 Aug 2006 4 Nov 2006, Certificate of Approval $800
2006-767 Alteration Multiple family dwellings, dormitories, etc. 8 Dec 2006 16 Nov 2021, Certificate of Approval $20,000
2007-72 Alteration Multiple family dwellings, dormitories, etc. 26 Feb 2007 8 Feb 2022, Certificate of Approval $850
2007-170 Alteration Multiple family dwellings, dormitories, etc. 16 Apr 2007 2 Mar 2009, Certificate of Approval $1,600
2007-181 Alteration Multiple family dwellings, dormitories, etc. 17 Apr 2007 9 Mar 2022, Certificate of Approval $4,000
2007-322 Alteration Multiple family dwellings, dormitories, etc. 12 Jun 2007 21 Jul 2021, Certificate of Approval $1,800
2007-425 Alteration Multiple family dwellings, dormitories, etc. 30 Jul 2007 9 Mar 2022, Certificate of Approval $4,230
2007-438 Alteration Multiple family dwellings, dormitories, etc. 2 Aug 2007 9 Mar 2022, Certificate of Approval $750
2007-466 Alteration Multiple family dwellings, dormitories, etc. 17 Aug 2007 17 Oct 2007, Certificate of Approval $7,200
2007-482 Alteration Multiple family dwellings, dormitories, etc. 22 Aug 2007 22 Dec 2007, Certificate of Approval $7,400
2007-493 Alteration Multiple family dwellings, dormitories, etc. 29 Aug 2007 13 Jan 2008, Certificate of Approval $1,800
2007-574 Alteration Multiple family dwellings, dormitories, etc. 2 Oct 2007 9 Mar 2022, Certificate of Approval $6,850
2008-45 Alteration Multiple family dwellings, dormitories, etc. 30 Jan 2008 9 Mar 2022, Certificate of Approval $800
2008-206 Alteration Multiple family dwellings, dormitories, etc. 23 Apr 2008 3 Nov 2021, Certificate of Approval $5,150
2008-427 Alteration Multiple family dwellings, dormitories, etc. 25 Jul 2008 16 Jul 2021, Certificate of Approval $4,400
2008-551 Alteration Multiple family dwellings, dormitories, etc. 18 Sep 2008 18 Sep 2009, Certificate of Approval $5,775
2009-179 Alteration Multiple family dwellings, dormitories, etc. 9 Apr 2009 9 Mar 2022, Certificate of Approval $650
2009-347 Alteration Multiple family dwellings, dormitories, etc. 29 Jun 2009 24 May 2010, Certificate of Approval $1,400
2009-371 Alteration Multiple family dwellings, dormitories, etc. 15 Jul 2009 9 Mar 2022, Certificate of Approval $2,400
2009-424 Alteration Multiple family dwellings, dormitories, etc. 10 Aug 2009 25 Feb 2026, Certificate of Approval $7,000

The file does not name the work. This file is a full record from 2021 on. Older permits are mostly missing. A repair from before then can be absent here and still be at the Cliffside Park Boro construction office.

Flood zone for 200 WINSTON DR-C1007

FEMA’s flood map places the mapped point for 200 WINSTON DR-C1007 in zone X.

The state’s 10-foot ground scan puts the lowest cell on this lot at 264.7 feet and the highest at 266.6 feet (NAVD88).

These figures are estimates. The zone and any flood elevation come from FEMA’s flood map at a point for this address, and that point can fall in the street. The high and low come from the state’s 10-foot ground scan of the lot outline. A cell can catch a ditch, the street, or the edge of the lot. They are not a survey and not an insurance rating. A licensed surveyor measures the ground and the building. The town floodplain administrator, or a licensed engineer, confirms what the zone means for this lot. No zone at this point, or zone X, does not mean the lot will not flood.

Water and sewer for 200 WINSTON DR-C1007

This lot is within the Bergen County UA sewer system. Please verify with the provider.

This lot is within the Veolia Water NJ Hackensack water system. Please verify with the provider.

These lines come from the state’s sewer service areas and public community water areas, read at a point for this address. That point can fall in the street. Being inside a named area means the lot is inside that mapped system, not that a pipe or a meter is on the house. Being outside means the lot is outside the mapped service area, which is usually a septic system or a private well. It is not a hookup record. Please verify with the provider. How we read water and sewer.

Year-by-year assessed value & tax

From NJ MOD-IV files (2023, 2024, 2025, 2026). Tax is the MOD-IV billed amount when present; otherwise —. Current mailing is in Assessment above.

Year Assessed net Tax
2026 $316,500 —
2025 $316,500 $8,725.94
2024 $316,500 $8,472.74
2023 $316,500 $8,219.54

Mailing changed in 2026 to 200 WINSTON DR #1007, CLIFFSIDE PARK; NJ, 07010.

Assessed value & ratio history

Parcel assessed nets come from MOD-IV year files (2023, 2024, 2025, 2026). Town average ratios are from Abstract / Chapter 123 when available — implied equalized = assessed ÷ (ratio ÷ 100).

Tax year Assessed net Avg ratio Implied equalized Assessed Δ Equalized Δ
2023 $316,500 76.43% $414,104 — —
2024 $316,500 72.11% $438,913 0.0% +6.0%
2025 $316,500 68.46% $462,314 0.0% +5.3%
2026 $316,500 63.94% $494,995 0.0% +7.1%

Tax year history

Assessed net is from that year’s MOD-IV file. Est. tax = assessed × that year’s general rate when we have the rate sheet. Billed tax is the MOD-IV tax field when present (often empty for the newest file year).

Tax year Assessment net General rate Est. tax (that year) Billed tax Est. vs prior
2023 $316,500 2.676 $8,470 $8,219.54 —
2024 $316,500 2.756 $8,723 $8,472.74 +3.0%
2025 $316,500 2.836 $8,976 $8,725.94 +2.9%
2026 $316,500 — — — —

Where your money goes

Component $ = net × (component rate ÷ 100). Percents are share of school + county + municipal components for rate year 2025.

Schools
$4,133 46.1%
County
$1,092 12.2%
Municipal
$3,751 41.8%

Of the estimated increase of $253, the school portion moved $89 up, the county portion $57 up, and the municipal portion $108 up. Those are pieces of the dollar change. They are not a change in each share of the rate.

District school (1.306)$4,133
County (0.330)$1,044
County open space (0.015)$47
Municipal purpose (1.137)$3,599
Municipal library (0.048)$152

Property details

Class2 — Residential (four families or less)
Building class39 — Good quality row house or townhouse
Building30SRC
Land description1211 SF
Dwellings1
Commercial units—
Year built1973
Acreage0.0278
Zoning—
Tax map page—
Additional lots—
Census tract / block—
Special tax codes—
MOD-IV current-year tax—
Last sale$440,000 · 11/20/2025 · sale assessment $316,500
Deed book / page05670 / 01034

The class, building class, SR1A, and special-tax words are the state’s names for those codes. The zoning code is the town’s. A code that is not on the state list keeps the code and says so.

See this lot on the statewide map, then come back for the full tax story.

Show on map

Sources: NJ Division of Taxation MOD-IV (current parcel file) and tax rates for 2025 (Abstract of Ratables). Building permits are read live from the NJ construction-permit file for this block and lot. The flood zone is read live from FEMA’s flood map at a point for this address. The high and low are read live from the state’s 10-foot ground scan. Water and sewer are read live from the state’s service-area maps at that same point. Those map readings are estimates, not a survey and not a hookup record. Estimates are not an official tax bill. Owner names are not shown. Water and sewer · Full disclaimer.