190 STRYKERS ROAD

Lopatcong Twp, Warren County · Block 99, Lot 2

Show on map

Assessment year 2026 · Rate year 2025 · Prior rate 2024

Assessments are tax year 2026; latest published general rate we have is 2025. Estimate uses that rate until the 2026 rate is loaded.

Estimated tax story (homeowner view)
+1.8%

Estimated tax up $7,842 ($425,916 → $433,759) using 2024→2025 rates (2.987 → 3.042) × assessed net.

Assessment net change: 0.0% ($14,259,000 → $14,259,000).

Assessment

Land$788,300
Improvements$13,470,700
Net (taxable assessed, 2026)$14,259,000
Town avg ratio used68.98% (Average ratio (Director’s / Chapter 123))
Implied equalized value$20,671,209
2025 tax (MOD-IV billed)$433,758.78
Est. 2025 tax @ general rate$433,759
Mailing address (2026)PO BOX 96001, CAMDEN; NJ, 08101

How the ratio works: New Jersey towns often assess below full market value. The average ratio (Director’s / Chapter 123) estimates what percent of true market value the town’s assessments represent. Implied equalized value ≈ assessed net ÷ (ratio ÷ 100). Example: assessed $187,600 at 55.89% ≈ $335,700 equalized. Tax bills still use assessed value × the general tax rate — not the equalized figure.

The stored sale is not used for a change-since-sale figure. SR1A 26 — Not a willing-buyer, willing-seller sale, for a reason outside the other codes marks it non-usable, or the price is a nominal amount.

Building permits for 190 STRYKERS ROAD

The New Jersey construction-permit file lists 50 permits for 190 STRYKERS ROAD in Lopatcong Twp. 22 are still open in the state file. Permit 16-0199, a new building, was issued 11 May 2016 and closed 26 Apr 2017 with a Certificate of Occupancy. The reported cost is $1,346,786. The reported size is 149,215 square feet.

Permit Type Use Issued Closed Reported cost
12-0013 Alteration Business Uses 12 Jan 2012 3 Apr 2018, Certificate of Approval $72,500
16-0199 New Storage building, moderate hazard 11 May 2016 26 Apr 2017, Certificate of Occupancy $1,346,786
16-0426 Alteration Storage building, moderate hazard 16 Sep 2016 17 Feb 2022, Certificate of Approval $16,400
16-0556 Alteration Storage building, moderate hazard 15 Dec 2016 9 Feb 2022, Certificate of Approval $71,000
17-0115 Alteration Storage building, moderate hazard 1 Mar 2017 17 Feb 2022, Certificate of Approval $39,860
17-0260 Alteration Factory and industrial, moderate hazard 9 Jun 2017 3 Apr 2018, Certificate of Approval $9,800
17-0258 Alteration Storage building, moderate hazard 9 Jun 2017 3 Apr 2018, Certificate of Approval $75,000
17-0259 Alteration Factory and industrial, moderate hazard 9 Jun 2017 3 Apr 2018, Certificate of Approval $30,000
17-0261 Alteration Factory and industrial, moderate hazard 9 Jun 2017 3 Apr 2018, Certificate of Approval $11,000
17-0326 Alteration Factory and industrial, moderate hazard 19 Jul 2017 17 Feb 2022, Certificate of Approval $250,000
17-0396 Alteration Factory and industrial, moderate hazard 24 Aug 2017 3 Apr 2018, Certificate of Approval $16,578
17-0397 Alteration Factory and industrial, moderate hazard 24 Aug 2017 3 Apr 2018, Certificate of Approval $48,000
17-0308 Alteration Factory and industrial, moderate hazard 5 Sep 2017 3 Apr 2018, Certificate of Approval $278,000
17-0399 Alteration Factory and industrial, moderate hazard 5 Sep 2017 17 Feb 2022, Certificate of Approval $22,000
17-0509 Alteration Accessory buildings and miscellaneous structures 14 Nov 2017 3 Apr 2018, Certificate of Approval $21,500
17-0530 Alteration Factory and industrial, moderate hazard 5 Dec 2017 17 Feb 2022, Certificate of Approval $12,130
18-0001 Alteration Factory and industrial, moderate hazard 2 Jan 2018 3 Apr 2018, Certificate of Approval $6,000
17-0326+A Alteration Factory and industrial, moderate hazard 30 Jan 2018 Open in the state file $26,255
17-0535 Alteration Factory and industrial, moderate hazard 30 Jan 2018 25 Oct 2018, Certificate of Approval $100
21-0283 Alteration Factory and industrial, moderate hazard 25 Aug 2021 16 Sep 2021, Certificate of Approval $15,000
21-0300 Alteration Accessory buildings and miscellaneous structures 9 Sep 2021 17 Feb 2022, Certificate of Approval $25,000
21-0371 Alteration Accessory buildings and miscellaneous structures 9 Nov 2021 17 Feb 2022, Certificate of Approval $14,000
22-0087 Alteration Accessory buildings and miscellaneous structures 24 Mar 2022 13 Jul 2022, Certificate of Approval $15,000
22-0432 Alteration Factory and industrial, moderate hazard 28 Dec 2022 24 Jan 2024, Certificate of Approval $240,000
23-0101 Alteration Factory and industrial, moderate hazard 23 Feb 2023 23 Jan 2024, Temporary Certificate of Occupancy $500,000
23-0101+A Alteration Factory and industrial, moderate hazard 20 Mar 2023 Open in the state file $300,000
23-0101+B Alteration Factory and industrial, moderate hazard 29 Mar 2023 Open in the state file $80,000
23-0181 Alteration Factory and industrial, moderate hazard 19 Apr 2023 Open in the state file $100,000
23-0101+C Alteration Factory and industrial, moderate hazard 25 Apr 2023 Open in the state file $3,400
23-0181+A Alteration Factory and industrial, moderate hazard 27 Apr 2023 Open in the state file $2,000
23-0181+B Alteration Factory and industrial, moderate hazard 22 May 2023 Open in the state file $350,000
23-0101+D Alteration Factory and industrial, moderate hazard 22 May 2023 Open in the state file $25,000
23-0181+C Alteration Factory and industrial, moderate hazard 17 Jul 2023 Open in the state file $102,000
23-0181+D Alteration Factory and industrial, moderate hazard 17 Jul 2023 Open in the state file $50
23-0340 Alteration Factory and industrial, moderate hazard 16 Aug 2023 23 Apr 2024, Certificate of Occupancy $510,000
23-0181+E Alteration Factory and industrial, moderate hazard 18 Sep 2023 Open in the state file $30,000
23-0181+F Alteration Factory and industrial, moderate hazard 18 Sep 2023 Open in the state file $44,000
23-0340+A Alteration Factory and industrial, moderate hazard 5 Jan 2024 Open in the state file $65,000
23-0340+B Alteration Factory and industrial, moderate hazard 5 Jan 2024 Open in the state file $85,000
23-0340+C Alteration Factory and industrial, moderate hazard 5 Jan 2024 Open in the state file $95,000
23-0340+D Alteration Factory and industrial, moderate hazard 10 Jan 2024 Open in the state file $400,000
23-0340+E Alteration Factory and industrial, moderate hazard 10 Jan 2024 Open in the state file $1,000
23-0340+F Alteration Factory and industrial, moderate hazard 10 Jan 2024 Open in the state file $150,000
23-0340+G Alteration Factory and industrial, moderate hazard 10 Jan 2024 Open in the state file $4,000
23-0340+H Alteration Factory and industrial, moderate hazard 9 Feb 2024 Open in the state file $25,675
25-0052+A Alteration Factory and industrial, moderate hazard 3 Feb 2025 24 Apr 2026, Certificate of Approval $22,000
25-0052 Alteration Factory and industrial, moderate hazard 3 Feb 2025 24 Apr 2026, Certificate of Approval $100
25-0054 Alteration Factory and industrial, moderate hazard 4 Feb 2025 Open in the state file $2
25-0053 Alteration International Residential Code 4 Feb 2025 24 Apr 2026, Certificate of Approval $35,000
25-0106 Alteration Factory and industrial, moderate hazard 21 Mar 2025 Open in the state file $20,000

The file does not name the work. This file is a full record from 2021 on. Older permits are mostly missing. A repair from before then can be absent here and still be at the Lopatcong Twp construction office.

Flood zone for 190 STRYKERS ROAD

The flood map could not be checked for 190 STRYKERS ROAD, because the address did not place a point on the map. Assessment and tax figures on this page are from our own records.

The state’s 10-foot ground scan puts the lowest cell on this lot at 335.4 feet and the highest at 357.9 feet (NAVD88).

These figures are estimates. The zone and any flood elevation come from FEMA’s flood map at a point for this address, and that point can fall in the street. The high and low come from the state’s 10-foot ground scan of the lot outline. A cell can catch a ditch, the street, or the edge of the lot. They are not a survey and not an insurance rating. A licensed surveyor measures the ground and the building. The town floodplain administrator, or a licensed engineer, confirms what the zone means for this lot. No zone at this point, or zone X, does not mean the lot will not flood.

Water and sewer for 190 STRYKERS ROAD

The water and sewer maps could not be checked for 190 STRYKERS ROAD, because the address did not place a point on the map.

Year-by-year assessed value & tax

From NJ MOD-IV files (2023, 2024, 2025, 2026). Tax is the MOD-IV billed amount when present; otherwise —. Current mailing is in Assessment above.

Year Assessed net Tax
2026 $14,259,000 —
2025 $14,259,000 $433,758.78
2024 $14,259,000 $425,916.33
2023 $14,259,000 $407,664.81

Mailing changed in 2025 to PO BOX 96001, CAMDEN; NJ, 08101.

Assessed value & ratio history

Parcel assessed nets come from MOD-IV year files (2023, 2024, 2025, 2026). Town average ratios are from Abstract / Chapter 123 when available — implied equalized = assessed ÷ (ratio ÷ 100).

Tax year Assessed net Avg ratio Implied equalized Assessed Δ Equalized Δ
2023 $14,259,000 92.69% $15,383,537 — —
2024 $14,259,000 87.14% $16,363,323 0.0% +6.4%
2025 $14,259,000 79.39% $17,960,700 0.0% +9.8%
2026 $14,259,000 68.98% $20,671,209 0.0% +15.1%

Tax year history

Assessed net is from that year’s MOD-IV file. Est. tax = assessed × that year’s general rate when we have the rate sheet. Billed tax is the MOD-IV tax field when present (often empty for the newest file year).

Tax year Assessment net General rate Est. tax (that year) Billed tax Est. vs prior
2023 $14,259,000 2.859 $407,665 $407,664.81 —
2024 $14,259,000 2.987 $425,916 $425,916.33 +4.5%
2025 $14,259,000 3.042 $433,759 $433,758.78 +1.8%
2026 $14,259,000 — — — —

Where your money goes

Component $ = net × (component rate ÷ 100). Percents are share of school + county + municipal components for rate year 2025.

Schools
$237,983 54.9%
County
$103,806 23.9%
Municipal
$91,971 21.2%

Of the estimated increase of $7,842, the school portion moved $285 down, the county portion $6,417 up, and the municipal portion $1,711 up. Those are pieces of the dollar change. They are not a change in each share of the rate.

District school (1.669)$237,983
County (0.652)$92,969
County library (0.050)$7,130
County open space (0.026)$3,707
Municipal purpose (0.615)$87,693
Municipal open space (0.030)$4,278

Property details

Class4B — Industrial
Building class10 — not listed in the state appraisal manual
Building—
Land description15.02
Dwellings1
Commercial units—
Year built1984
Acreage15.02
ZoningROM — town zoning code
Tax map page4
Additional lots—
Census tract / block—
Special tax codes—
MOD-IV current-year tax—
Last sale$35,925,000 · 2/16/2022 · sale assessment $14,259,000 · SR1A 26 — Not a willing-buyer, willing-seller sale, for a reason outside the other codes
Deed book / page03244 / 00175

The class, building class, SR1A, and special-tax words are the state’s names for those codes. The zoning code is the town’s. A code that is not on the state list keeps the code and says so.

See this lot on the statewide map, then come back for the full tax story.

Show on map

Sources: NJ Division of Taxation MOD-IV (current parcel file) and tax rates for 2025 (Abstract of Ratables). Building permits are read live from the NJ construction-permit file for this block and lot. The flood zone is read live from FEMA’s flood map at a point for this address. The high and low are read live from the state’s 10-foot ground scan. Water and sewer are read live from the state’s service-area maps at that same point. Those map readings are estimates, not a survey and not a hookup record. Estimates are not an official tax bill. Owner names are not shown. Water and sewer · Full disclaimer.