204 DICKSON CT

Highland Park Boro, Middlesex County · Block 402, Lot 5.1, Qual C0204

Show on map

Assessment year 2026 · Rate year 2025 · Prior rate 2024

Assessments are tax year 2026; latest published general rate we have is 2025. Estimate uses that rate until the 2026 rate is loaded.

Estimated tax story (homeowner view)
+6.3%

Estimated tax up $832 ($13,235 → $14,067) using 2024→2025 rates (2.562 → 2.723) × assessed net.

Assessment net change: 0.0% ($516,600 → $516,600).

Assessment

Land$245,000
Improvements$271,600
Net (taxable assessed, 2026)$516,600
Town avg ratio used94.73% (Average ratio (Director’s / Chapter 123))
Implied equalized value$545,339
2025 tax (MOD-IV billed)$14,067.02
Est. 2025 tax @ general rate$14,067
Mailing address (2026)204 DICKSON CT, HIGHLAND PARK; NJ, 08904

How the ratio works: New Jersey towns often assess below full market value. The average ratio (Director’s / Chapter 123) estimates what percent of true market value the town’s assessments represent. Implied equalized value ≈ assessed net ÷ (ratio ÷ 100). Example: assessed $187,600 at 55.89% ≈ $335,700 equalized. Tax bills still use assessed value × the general tax rate — not the equalized figure.

Change since the 2025 sale of $585,000: implied equalized value $545,339 is $39,661 below that sale. This is not an appraisal.

This class 2 — residential (four families or less) — net assessment sits above the town class-2 average of $482,264.

Building permits for 204 DICKSON CT

The New Jersey construction-permit file lists 50 permits for 204 DICKSON CT in Highland Park Boro. 15 are still open in the state file. Permit 20-121, a new building, was issued 10 Mar 2020 and closed 24 Jun 2021 with a Temporary Certificate of Occupancy. The reported cost is $117,450. The reported size is 1,975 square feet.

Permit Type Use Issued Closed Reported cost
19-448 New Multiple family dwellings, dormitories, etc. 27 Jun 2019 1 Oct 2021, Certificate of Occupancy $100,000
19-447 New Multiple family dwellings, dormitories, etc. 27 Jun 2019 15 Sep 2021, Certificate of Occupancy $100,000
19-449 New Multiple family dwellings, dormitories, etc. 27 Jun 2019 15 Sep 2021, Certificate of Occupancy $100,000
19-463 New Multiple family dwellings, dormitories, etc. 3 Jul 2019 1 Oct 2021, Certificate of Occupancy $80,000
19-466 New Multiple family dwellings, dormitories, etc. 3 Jul 2019 14 Sep 2021, Certificate of Occupancy $100,000
19-714 New Multiple family dwellings, dormitories, etc. 14 Nov 2019 15 Sep 2021, Certificate of Occupancy $117,450
19-713 New Multiple family dwellings, dormitories, etc. 14 Nov 2019 1 Oct 2021, Certificate of Occupancy $117,450
19-711 New Multiple family dwellings, dormitories, etc. 14 Nov 2019 15 Sep 2021, Certificate of Occupancy $117,450
19-745 New Multiple family dwellings, dormitories, etc. 21 Nov 2019 1 Oct 2021, Certificate of Occupancy $96,400
20-061 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 5 Oct 2021, Certificate of Occupancy $117,450
20-051 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 25 May 2021, Temporary Certificate of Occupancy $117,450
20-060 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 5 Oct 2021, Certificate of Occupancy $117,450
20-059 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 4 Sep 2021, Temporary Certificate of Occupancy $117,450
20-058 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 9 Nov 2021, Certificate of Occupancy $117,450
20-057 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 5 Oct 2021, Certificate of Occupancy $117,450
20-056 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 9 Nov 2021, Certificate of Occupancy $117,450
20-055 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 11 Oct 2021, Certificate of Occupancy $117,450
20-054 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 9 Nov 2021, Certificate of Occupancy $117,450
20-053 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 15 Sep 2021, Temporary Certificate of Occupancy $117,450
20-052 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 5 Oct 2021, Temporary Certificate of Occupancy $117,450
20-062 New Multiple family dwellings, dormitories, etc. 28 Jan 2020 11 Jun 2021, Temporary Certificate of Occupancy $117,450
20-122 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 24 Jun 2021, Temporary Certificate of Occupancy $117,450
20-132 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 24 Jun 2021, Temporary Certificate of Occupancy $117,450
20-131 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 1 Oct 2021, Certificate of Occupancy $117,450
20-130 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 24 Jun 2021, Temporary Certificate of Occupancy $117,450
20-129 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 9 Nov 2021, Certificate of Occupancy $117,450
20-128 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 15 Sep 2021, Temporary Certificate of Occupancy $117,450
20-127 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 17 Jun 2021, Temporary Certificate of Occupancy $117,450
20-126 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 1 Oct 2021, Certificate of Occupancy $117,450
20-125 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 24 Jun 2021, Temporary Certificate of Occupancy $117,450
20-124 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 1 Oct 2021, Certificate of Occupancy $117,450
20-123 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 24 Jun 2021, Temporary Certificate of Occupancy $117,450
20-121 New Multiple family dwellings, dormitories, etc. 10 Mar 2020 24 Jun 2021, Temporary Certificate of Occupancy $117,450
20-053** Alteration Multiple family dwellings, dormitories, etc. 30 Aug 2021 Open in the state file $0
20-056** Alteration Multiple family dwellings, dormitories, etc. 8 Sep 2021 Open in the state file $0
20-054** Alteration Multiple family dwellings, dormitories, etc. 8 Sep 2021 Open in the state file $0
20-058** Alteration Multiple family dwellings, dormitories, etc. 8 Sep 2021 Open in the state file $0
19-711* Alteration Multiple family dwellings, dormitories, etc. 15 Sep 2021 Open in the state file $0
19-714* Alteration Multiple family dwellings, dormitories, etc. 15 Sep 2021 Open in the state file $0
21-472 Alteration International Residential Code 4 Oct 2021 21 Sep 2022, Certificate of Approval $596
22-134 Alteration International Residential Code 22 Mar 2022 23 Mar 2022, Certificate of Approval $1,200
22-422 Alteration International Residential Code 15 Sep 2022 Open in the state file $2,400
23-360 Alteration International Residential Code 22 Aug 2023 Open in the state file $600
24-093 Alteration International Residential Code 6 Mar 2024 Open in the state file $1,100
25-056 Alteration International Residential Code 10 Feb 2025 Open in the state file $1,200
25-064 Alteration International Residential Code 11 Feb 2025 Open in the state file $950
25-180 Alteration International Residential Code 5 May 2025 Open in the state file $1,500
25-265 Alteration International Residential Code 30 Jun 2025 Open in the state file $1,425
25-377 Alteration International Residential Code 15 Sep 2025 Open in the state file $1,800
26-180 Alteration International Residential Code 5 May 2026 Open in the state file $1,300

The file does not name the work. This file is a full record from 2021 on. Older permits are mostly missing. A repair from before then can be absent here and still be at the Highland Park Boro construction office.

Flood zone for 204 DICKSON CT

The flood map could not be checked for 204 DICKSON CT, because the address did not place a point on the map. Assessment and tax figures on this page are from our own records.

The state’s 10-foot ground scan puts the lowest cell on this lot at 69.1 feet and the highest at 71.2 feet (NAVD88).

These figures are estimates. The zone and any flood elevation come from FEMA’s flood map at a point for this address, and that point can fall in the street. The high and low come from the state’s 10-foot ground scan of the lot outline. A cell can catch a ditch, the street, or the edge of the lot. They are not a survey and not an insurance rating. A licensed surveyor measures the ground and the building. The town floodplain administrator, or a licensed engineer, confirms what the zone means for this lot. No zone at this point, or zone X, does not mean the lot will not flood.

Water and sewer for 204 DICKSON CT

The water and sewer maps could not be checked for 204 DICKSON CT, because the address did not place a point on the map.

Year-by-year assessed value & tax

From NJ MOD-IV files (2023, 2024, 2025, 2026). Tax is the MOD-IV billed amount when present; otherwise —. Current mailing is in Assessment above.

Year Assessed net Tax
2026 $516,600 —
2025 $516,600 $14,067.02
2024 $516,600 $13,235.29
2023 $516,600 $12,904.67

Mailing changed in 2024 to 204 DICKSON CT, HIGHLAND PARK; NJ, 08904.

Assessed value & ratio history

Parcel assessed nets come from MOD-IV year files (2023, 2024, 2025, 2026). Town average ratios are from Abstract / Chapter 123 when available — implied equalized = assessed ÷ (ratio ÷ 100).

Tax year Assessed net Avg ratio Implied equalized Assessed Δ Equalized Δ
2023 $516,600 37.49% $1,377,967 — —
2024 $516,600 100.00% $516,600 0.0% -62.5%
2025 $516,600 100.00% $516,600 0.0% 0.0%
2026 $516,600 94.73% $545,339 0.0% +5.6%

2024: Published average ratio exceeded 100%; New Jersey treats that as 100% for equalization.

2025: Published average ratio exceeded 100%; New Jersey treats that as 100% for equalization.

Tax year history

Assessed net is from that year’s MOD-IV file. Est. tax = assessed × that year’s general rate when we have the rate sheet. Billed tax is the MOD-IV tax field when present (often empty for the newest file year).

Tax year Assessment net General rate Est. tax (that year) Billed tax Est. vs prior
2023 $516,600 2.498 $12,905 $12,904.67 —
2024 $516,600 2.562 $13,235 $13,235.29 +2.6%
2025 $516,600 2.723 $14,067 $14,067.02 +6.3%
2026 $516,600 — — — —

Where your money goes

Component $ = net × (component rate ÷ 100). Percents are share of school + county + municipal components for rate year 2025.

Schools
$8,586 61.0%
County
$1,741 12.4%
Municipal
$3,740 26.6%

Of the estimated increase of $832, the school portion moved $630 up, the county portion $88 up, and the municipal portion $114 up. Those are pieces of the dollar change. They are not a change in each share of the rate.

District school (1.662)$8,586
County (0.308)$1,591
County open space (0.029)$150
Municipal purpose (0.692)$3,575
Municipal library (0.032)$165

Property details

Class2 — Residential (four families or less)
Building class39 — Good quality row house or townhouse
BuildingAURORA
Land description—
Dwellings1
Commercial units—
Year built2020
Acreage—
Zoning—
Tax map page401
Additional lots—
Census tract / block—
Special tax codes—
MOD-IV current-year tax—
Last sale$585,000 · 12/16/2025 · sale assessment $516,600 · SR1A 00 — Usable for the sales study
Deed book / page19909 / 01702

The class, building class, SR1A, and special-tax words are the state’s names for those codes. The zoning code is the town’s. A code that is not on the state list keeps the code and says so.

See this lot on the statewide map, then come back for the full tax story.

Show on map

Sources: NJ Division of Taxation MOD-IV (current parcel file) and tax rates for 2025 (Abstract of Ratables). Building permits are read live from the NJ construction-permit file for this block and lot. The flood zone is read live from FEMA’s flood map at a point for this address. The high and low are read live from the state’s 10-foot ground scan. Water and sewer are read live from the state’s service-area maps at that same point. Those map readings are estimates, not a survey and not a hookup record. Estimates are not an official tax bill. Owner names are not shown. Water and sewer · Full disclaimer.